Skip to main content
Menu

PipeQC · piping quality control PipeQC product

From isometric to hydrotest every joint has a passport

PipeQC follows a pipeline from drawing to test. You can see who welded a joint, under which procedure, what inspection found and what still blocks the test.

LINE 6"-P-2041-A1 · ISO · REV 3 J-02 J-05 J-1029 · reject FL-03 · flange → E-104 SP-01 ✓ SP-02 ✓ SP-03 in progress
Joint J-1029 Accepted
  • Material · heat H-58812 02.09
  • Welding · WLD-14 · WPS-07 04.09
  • Radiography · report RT-0412 09.09
  • Hydrotest · pack TP-12 waiting

PipeQC demo stand

01 · How a plant is built

Pipes inside the plant, not a trunk pipeline

A refinery, a gas complex, a chemical plant, a power station. Steam, gas, oil and acids run through their pipes under pressure. Without the pipes, the equipment just stands there.

01

Scale

A large plant has thousands of isometrics and tens of thousands of welded joints. Construction takes years, and several contractors work on site at the same time.

02

Cost of a mistake

A weld cannot be taken apart and remade after start-up. So every joint needs a passport: who welded it, under which procedure, and what inspection found. It is kept for decades.

03

The medium sets the rules

The fluid in the pipe determines the steel, the wall thickness and the share of joints sent for non-destructive testing. On water, a sample is checked; on a hazardous medium, every joint.

02 · Detailed pipe journey

One drawing passes all six stages

On the left is an isometric of a single line. Scroll down — at each stage the drawing updates just like the line record in the system.

  1. 01 · Isometric

    An isometric is a passport of a single line, not a site plan

    Design and issuance of isometric line drawing
    Engineering office · Issuing isometric drawing

    Designers issue an isometric drawing for construction — the path of a single line from pump to heat exchanger. Every straight run, elbow, tee and flange is numbered, with a bill of materials at the bottom. A medium plant requires thousands of these drawings.

    J-02 J-05 J-1029 FL-03 · фланец → E-104

    On drawing. Line 6"-P-2041-A1: joints J-01…J-11 and flange FL-03. So far, it is only a drawing.

  2. 02 · Spooling

    The line is cut into spools — twenty meters of pipe cannot be shipped in one piece

    Transporting finished pipe spools by semi-trailer
    Logistics · Delivery of spools to the plant

    A spool is a pipe section pre-assembled in the shop that fits on a standard flatbed. The cut between spools becomes a field joint welded on site. The more welds completed in the shop, the safer and cheaper the construction.

    FW-07 · полевой стык FL-03 · фланец → E-104 SP-01 SP-02 SP-03

    On drawing. The line is cut into three spools SP-01, SP-02, SP-03. Joint FW-07 becomes a field joint.

  3. 03 · Shop

    In the shop, each spool undergoes a chain of checks

    Welding a spool on a pipe rotator in the shop
    Shop · Assembly and welding under approved WPS

    Materials are verified by heat number — pipe and fittings must match project specifications. Only welders with valid qualifications for this procedure may weld. Every weld is inspected, and PWHT is performed if required.

    J-02 · сварен FW-07 · полевой J-05 · сварен → E-104 SP-01 ✓ SP-02 ✓ SP-03 …

    On drawing. SP-01 and SP-02 are fabricated, SP-03 is in progress. Welder and WPS are recorded for each joint.

  4. 04 · Inspection

    A weld cannot be disassembled. That is why it is X-rayed

    Non-destructive examination of a welded joint
    NDE Lab · Non-destructive examination

    The weld is inspected non-destructively by radiography or ultrasound. The percentage of joints tested is dictated by the medium class, from random sampling to 100%. Each welder has a unique stamp, so inspection directly traces who welded it.

    J-01 · трассер T2 J-02 · RT принят J-05 · RT принят J-1029 · брак J-11 · трассер T1 → E-104 SP-01 ✓ SP-02 ✓ SP-03 …

    On drawing. J-02 and J-05 are accepted. J-1029 failed RT, and the system automatically assigned a repair and two penalty tracers — J-11 and J-01, joints of the same welder.

  5. 05 · Erection

    On site, only what could not be welded in the shop is welded

    Crane erection of spools onto an industrial pipe rack
    Erection · Placing spools onto pipe rack

    Spools are hauled to the site, hoisted by cranes, and set onto pipe racks. Field joints are welded at height in any weather — driving up cost and risk. Flanges are torqued, and an inspector walks the line logging punch items.

    FW-07 · сварен на месте J-1029 · R1 принят FL-03 · нет записи затяжки → E-104 SP-01 ✓ SP-02 ✓ SP-03 ✓

    On drawing. Field joint FW-07 is welded, J-1029 is accepted after repair. Flange FL-03 lacks a torque record — the line is not ready for testing yet.

  6. 06 · Testing

    Not a single pipe is tested, but a whole pack of lines — with water above working pressure

    Hydrotesting of the erected line pack under pressure
    Testing · Pressure testing lines with pressure gauges

    Connected lines are grouped into a test pack and hydrotested together. In-line equipment is isolated with test blinds so pressure does not damage it. After testing, every installed blind must be removed and accounted for.

    ПАКЕТ TP-12 FL-03 · затянут → E-104 SP-01 ✓ SP-02 ✓ SP-03 ✓

    On drawing. The line joined test pack TP-12 with blinds on both ends. Every blind placed must be cleared.

03 · Why it breaks

Six stages, five parties, one joint

Today every party keeps its own file and passes data by email, phone or paper. With PipeQC everyone writes to one database, and the system draws the conclusions.

Today · everyone has a file With PipeQC · one database Design office xlsx Shop xlsx NDE lab pdf Erection paper Testing xlsx drawing · email request · paper ✕ reject · phone spools · note ✕ summary · Excel ✕ data is lost: the reject never reached the shop, blockers surfaced on test day imports drawings heat · welder inspection result joints · supports sees readiness One database Passport for every joint Cascade on a reject Readiness for test

Today · everyone has a file

  • Design office → Shop: drawing · email
  • Shop → NDE lab: request · paper
  • NDE lab → Shop: ✕ reject · phone
  • Shop → Erection: spools · note
  • Erection → Testing: ✕ summary · Excel

✕ data is lost: the reject never reached the shop, blockers surfaced on test day

With PipeQC · one database

  • Design office → imports drawings
  • Shop → heat · welder
  • NDE lab → inspection result
  • Erection → joints · supports
  • Testing → sees readiness
  • Passport for every joint
  • Cascade on a reject
  • Readiness for test

04 · How the product works

Modules follow the construction stages

Each party works in its own module, and everyone writes to one database. Project rules apply everywhere, and NDE serves both the shop and the site.

SETUP

Project rules — set before the first record and applied in every module

  • Welding procedures (WPS)
  • Welder qualifications
  • NDE inspection matrix
  • Project material list
  • Areas and subcontractors
  • Roles and access

SPOOLING

Preparation

Who works: spooling engineer

  1. Import the drawing package: joints, materials, flanges, supports
  2. Each row is checked against project reference data
  3. Isometrics and spools with revision history
  4. A new revision does not overwrite progress; the conflict goes to a decision
  5. Transmittals and HOLD for changed drawings

GateA row that contradicts reference data does not become work

hands over spools to the shop →

FABRICATION

Shop

Who works: shop subcontractor · QC engineer

  1. Material check by heat number
  2. Welding: a qualified welder and an approved WPS
  3. Spool supports
  4. Heat treatment when the procedure requires it
  5. Spool release, painting and finished-goods storage

GateA spool is released only when material is verified, all joints and supports are recorded, and inspection and heat treatment are closed

hands over spools to site →

ERECTION

Site

Who works: erection subcontractor · QC · owner inspector

  1. Receive the spool on site
  2. Check material and damage
  3. Erection, field joints and bolted flanges
  4. Supports
  5. Ready for test (RFT)

GateReadiness is not set by hand: welded, on supports, inspection and heat treatment closed

hands over lines into a pack →

TEST PACK

Test

Who works: test coordinator · blind and walkdown crews

  1. Assemble a pack from ready lines
  2. Install blinds
  3. Walk the line and record category X punch items
  4. Hydrotest and blind removal

GateA pack is not admitted to test while any readiness condition is open

NDE

Joint inspection · laboratory · shop and site joints

  1. Scope from the project matrix
  2. Batch of joints to the lab
  3. Result for each joint
  4. On a reject, repair and tracers

REPORTS

Reports and dossier

  • welding journal
  • NDE register
  • punch register
  • pack summary
  • test-pack dossier

05 · Reports and dossier

Five documents built from project records

PipeQC builds the registers and the handover dossier from current data. The same set comes in XLSX for work and PDF for signing and archive.

  • XLSX
  • PDF
  • RPT-W-001 XLSX · PDF

    Welding log

    Every weld: WPS, welder stamps, NDE, PWHT and heat numbers.

  • RPT-N-001 XLSX · PDF

    NDE register

    Every inspection obligation: method, batch, laboratory, result and report.

  • RPT-P-001 XLSX · PDF

    Punch list

    Category X punch items by test pack, open and closed.

  • RPT-T-002 XLSX · PDF

    Test pack summary

    Packs, test medium and pressure, readiness and dates.

  • DOS-T-001 XLSX · PDF

    Test pack handover dossier

    Pack composition, test act, weld history, NDE and punch items.

BasisASME B31.3 · ASME BPVC IX · API 1104 · ISO 3834-2 · ISO 9712

Files are built on download and are not stored in PipeQC. The act is signed on paper.

06 · Rollout

How PipeQC comes to a project

Architecture and rollout

  • Deployment on the customer's servers
  • Import of engineering data from design systems and spreadsheets
  • Roles for the owner, general contractor, subcontractors and the lab
  • Exchange with the warehouse, ERP and schedules
  • Change history for every joint and document

Pilot request